THURSDAY 9/12/2019
7:00 AM
Summer st. coming off of 135 will be closed at Cherry st. at 7:00 and traffic will be routed down Cherry.
Park rd. will be limited to local/residents only. and Essential buses only
Esty st. will be limited to local/residents only.and Essential buses only
Summer st coming off of Main st will be down to one lane near "auto sales" with flowable traffic. So the contractor may get started on a low level
8:30 AM
AFTER BUSES CLEAR ....Summer will be closed at Main same as today.
and closed at Park same as today.
with the above info still being applied
9:00 AM with all of the above still applied
The contractor will work their way out onto Main st taking up some of the lane in order to connect the Summer st water pipe to the Main st water pipe. Traffic will still be flowing on Main Toward 135