501 Pond Street
The Ashland Planning Board will continue the Public Hearing to hear the petition of Trask, Inc., 337 Turnpike Road, Suite 201, Southborough, MA 01742 requesting a Special Permit, Design Plan Review and Site Plan Review per Chapter 40A, Section 6 of the Massachusetts Zoning Act and Chapter 282, 8.8 (Pond Street Mixed Use Overlay District), 9.3 (Special Permits), 9.6 (Design Plan Review) and 9.4 (Site Plan Review) of the Ashland Bylaws. The applicant is proposing the development of 120 rental apartment units (54 two bedroom and 66 one bedroom) with approximately 6,825 sq. ft. of ground floor, street facing retail space. The project provides a total of 182 parking spaces. The project is proposed to be serviced by town water, sewer, and underground electric and gas. The property in question is located at 501 Pond Street, Assessors Map 29, Lot 151. The property is within the Highway Commerce Zoning District and the Pond Street Mixed Used Overlay Zoning District.
Original NOTICE OF PUBLIC HEARING
TOWN OF ASHLAND
501 Pond Street
The Ashland Planning Board will hold a Public Hearing on Thursday, January 13, 2022, at 7:15 PM via Zoom video conference at https://us02web.zoom.us/j/86512646250?pwd=R1NKNG9yQ3M4WTdXTXh6bmNFZlRaQT09, to hear the petition of Trask, Inc., 337 Turnpike Road, Suite 201, Southborough, MA 01742 requesting a Special Permit, Design Plan Review and Site Plan Review per Chapter 40A, Section 6 of the Massachusetts Zoning Act and Chapter 282, 8.8 (Pond Street Mixed Use Overlay District), 9.3 (Special Permits), 9.6 (Design Plan Review) and 9.4 (Site Plan Review) of the Ashland Bylaws. The applicant is proposing the development of 120 rental apartment units (64 two bedroom and 56 one bedroom) with approximately 2,351 sq. ft. of ground floor, street facing retail space. The project provides a total of 163 parking spaces, 9 spaces designated for retail use and 155 designated for residential tenants and guest. The project is proposed to be serviced by town water, sewer, and underground electric and gas. The property in question is located at 501 Pond Street, Assessors Map 29, Lot 151. The property is within the Highway Commerce Zoning District and the Pond Street Mixed Used Overlay Zoning District.
Parties wishing to be heard on this matter should submit comments to the Planning Board ahead of time and/or appear at the time and place indicated above. Materials may be viewed by appointment at Town Hall during normal business hours, or at: https://www.ashlandmass.com/543/Current-Cases-Before-the-Planning-and-Zo. For more information or to submit comments, please contact Peter Matchak at (508)532-7927 or at pmatchak@ashlandmass.com.
Tricia Kendall, Chairman
Ashland Planning Board
Current Documents
Planning Board Final Decision
Material Submitted for Oct 13, 2022 Meeting
- 1) Update letter 9.22.22
- 2) Letter From project engineer- Bruce Saluk
- 3) Updated site plan 9.20.22
- 4) Storwmater addendum - 9.22.22
- 5) MDM response 9.13.22
- 6) lighting cut sheets - copley wolff
- 7) 501 pond street special permit filing list of findings, waivers, spec...
- 9-29-22_Pond Street_Planting Plan
Submitted Material for Aug 11 Meeting
- 501 Pond 8.4.22 Update to Planning Board Aug 4 2022
- LTR-Engineering Response Letter 07 25 22
- Civil Site Plan _501 Pond St_07 25 22
- Legal Response letter from Applicant July 29_2022
- 501 Pond St - Sewer install estimate letter
- xr_planting-L-201_Planting List_Details
- xr_planting-L-200_Planting Plan
- xr_linework-L-300_Lighting Plan
- xr_linework-L-100_Landscape Plan
Prior Meeting Materials
- Updated Civil Set 7.21.2022
- updated architectural 7.21.22
- Plan Updates 7.21.2022
- MEMO parking 7.21.2022
- MEMO - Converse Way 7.21.2022
- Trellis design -Copley Wolff 7.21.2022
- 2257 501 Pond Street PSMUOD, SPSP Review Ltr 06-22-2022
- Ashland DRC Secondary Review of 501 Pond Street 2022-06-22
- 220519_Landscape PB Submission 4
- 2022-05-19 - 501 Pond Updated Package
- 1163 Autoturn (5-19-2022)
Related Documents
Planning Board Final Decision
- Updated Traffic Study_May 5 2022
- Updated Civil Plan Set_May 5 2022
- Updated Landscape Linework_May 5 2022
- MEMO real estate tax value_May 5 2022
- MEMO updated administrative procedures compliance_May 5 2022
- MEMO AW school aged children report_May 5 2022
- 501 pond 5.5.2022 Resubmittal Update
- 501 Pond 220421_linework
- Layout Plan Perspective_4-8-2022
- 2022-4-7-2022-501 Pond Revised Plan
- Letter_Plan Updates 4.7.22
- 501 Pond- 2.24.22 updated landscape and site
- 501 Pond - 2.24.22 updated architectural
- 501 Pond - 2.24.22 Updates Narrative
- 501 pond letter from applicant 2.1.22
- _Letter From Anna Tesmenitsky_Recieved Jan 13_2022_
- 501 Pond_First Service Letter Dec 20_2021
- Public Hearing Notice_TC Filed
- 1. Cover Letter and Zoning analysis
- 2. Narrative and project details
- 3. PB letter- MAK
- 4. Application, taxes, abutters list
- 5. Checks for application
- 6. Siteplans 11.1.5.2021
- 7. Pond Street Architectural -10.26.21
- 8. Pond Street Landscape Set - 2021-10-26
- 9. Construction timeline
- 10. Oxbow Letter
- 11. MDM Transportation - Traffic Report
- 12 . SW Report-2874-111521
- 13. original application - received
- Appliaction Rejection Letter Nov 2_2021
Submitted Material for Aug 11 Meeting
Material Submitted for Oct 13, 2022 Meeting
-